프로젝트 유형: Heavy‑duty guide rail lift platform (5‑ton, 17.1m ultra‑high travel)
의뢰인: A leading global manufacturer of industrial air purification and waste gas treatment systems
위치: Client’s manufacturing facility
산업: Industrial air treatment and emission control equipment manufacturing
핵심 기능: Fully automatic vertical transfer of large filtration units, ductwork sections, and system components across three production floors
주요 매개변수: 5‑ton capacity, 17.1m travel, platform 2600×3200mm, 4‑cylinder 8‑column structure, Siemens PLC with AGV interlock module
산업 현황
This client is a global leader in industrial air purification and waste gas treatment systems, producing large‑scale filtration units, scrubbers, VOCs treatment systems, and ductwork networks. These products are characterised by large dimensions, heavy loads, and modular construction – a single filtration unit can weigh several tons, with duct sections reaching several metres in length.
As the factory expanded and adopted lean manufacturing principles, a critical bottleneck emerged: how to move large system components efficiently and safely between three production floors?
Traditional solutions – forklifts combined with freight lifts – struggled with 17‑metre vertical travel. Forklifts couldn’t enter standard freight lifts directly, requiring multiple handling steps per transfer. This resulted in low material flow efficiency, frequent manual intervention, and increased safety risks. The client needed a system capable of lifting 5‑ton loads to 17 metres while integrating seamlessly with AGVs for fully automated material flow.
기본 매개변수
| 매개변수 | 사양 |
|---|---|
| 모델 | Guide rail lift platform (SJD5.0‑17.1) |
| 정격 부하 | 5000 kg |
| Lift travel | 17,100 mm |
| 플랫폼 크기(W×D) | 2600 × 3200 mm |
| Stations | 3 stops / 3 stations |
| 바닥 문 | Hard rapid roll‑up doors on each floor |
| Core structure | 실린더 4개, 기둥 8개 |
| 제어 시스템 | Siemens PLC with AGV interlock module |
| 모터 | 지멘스 |
| Electrical components | Schneider |
| Bearings | NSK |
| 주요 특징 | Pre‑leveling device, full‑height perforated panel enclosure |
| Project date | 2026 |
도전
- Structural rigidity at extreme height: 17.1m vertical travel places extreme demands on rail verticality, frame bending resistance, and chain tension stability. Conventional lifts are prone to deflection and wobble at such heights.
- Seamless AGV integration: The system had to be “plug‑and‑play” compatible with AGVs, requiring control architecture designed from the outset with AGV communication interfaces and dispatch logic.
- Three‑floor isolation and safety: The lift shaft connects three active production floors, requiring reliable isolation on each level – ensuring safety access control, temperature/noise management, and no bottleneck in material flow.
- Fast‑track deployment: An aggressive project timeline demanded complete design‑to‑delivery within a compressed schedule.

솔루션
Tower‑Grade Structural Design – 4 Cylinders, 8 Columns + Reinforced Rails
Design approach: 17.1m travel with 5‑ton loads required a structural solution beyond standard specifications.
We adopted a 4‑cylinder drive + 8‑guide‑rail support heavy‑duty architecture. The eight rails, closely connected to the columns, together with the platform frame form a highly indeterminate spatial frame structure – redistributing forces through multiple connection points under eccentric loads to effectively suppress tilting and sway. Reinforced rails and precision guidance ensure smooth, wobble‑free operation across the full 17.1m stroke.
Advantage: Achieves stable 5‑ton lifting at 17m height – eliminating deflection and sway risks.
Smart Control with AGV‑Ready Interface – Industry 4.0 Ready
Design approach: AGV integration capability was built into the control architecture from day one – not retrofitted later.
We used a 지멘스 PLC with a pre‑integrated AGV communication interface module. Communication supports hardwired connections, RS485, or dry contact signals. Core signal exchange includes:
- AGV sends: call request, target floor, door open/close requests, load in/out confirmation
- Lift sends: current floor, position‑reached signal, door status
Advantage: Direct connection to AGV dispatch systems with no secondary modification – “plug‑and‑play” integration into existing or planned automated logistics networks.
Hard Rapid Door Isolation – Safety and Efficiency Combined
Design approach: Hard rapid roll‑up doors installed on each floor, electrically interlocked with the lift platform – door open → platform cannot move; platform moving → all doors remain closed; platform landed → corresponding door unlocks.
Advantage: Hard doors offer excellent impact resistance and sealing; fast open/close minimises waiting time and does not create a material flow bottleneck.
Modular Design & Fast‑Track Delivery
Design approach: Pre‑engineered modular methodology – design, fabrication, and assembly proceeded in parallel, with on‑site installation synchronised with factory prefabrication.
Advantage: Achieved full design‑to‑delivery within a compressed timeline without compromising quality or specifications.
워크플로우
Step 1: AGV calls the lift – AGV arrives at ground floor with palletised component and sends an automatic call request.
Step 2: Door opens and load enters – The rapid door opens, the platform levels, and the AGV deposits the load.
Step 3: Vertical transfer – The platform lifts the component at controlled speed to the target production floor.
Step 4: Load exits – The destination floor door opens, and another AGV or workstation retrieves the component for the next assembly step.
Step 5: Cycle repeats – The platform resets, ready for the next cycle – enabling continuous, scheduled material flow with minimal manual intervention.