Project: Double‑deck scissor car lift
Client: Sandy LEONELLI (French automotive aftermarket company)
Highlights: Ultra‑low profile + pit installation + double‑deck offset design + 8‑ton capacity + 20GP container segmented shipping + CE export
Customer Needs
France’s growing vehicle fleet drives strong demand for heavy‑duty lifting equipment in the repair market. The client needed a large platform that can lift vehicles and prepare tools simultaneously, with the following requirements:
- 600mm ultra‑low closed height, pit‑installed (pit depth 600mm) for ramp‑free vehicle entry
- Different platform sizes (lower 2600×5900mm / upper 2900×6200mm), each deck rated 4,000kg
- 3,000mm lifting height, 2 stops
- Left‑rear column offset to facilitate vehicle access, plus a 3‑metre access ladder
- Must fit into a 20GP container for sea freight, colour matt black, CE certified
Core Specifications
| Parameter | Value |
|---|---|
| Capacity | 4,000kg per deck / total 8,000kg |
| Lifting height | 3,000mm |
| Closed height / Pit depth | 600mm / 600mm |
| Lower platform | 2,600 × 5,900mm |
| Upper platform | 2,900 × 6,200mm |
| Access direction | 2,600 / 2,900mm side |
| Cylinders | Φ140 × 2 |
| Power unit | 7.5kW / 380V / 50Hz |
| Scissor arm section | J300×150×8 |
| Deck plate | Double 8mm chequer plate |
| Ladder height | 3m |
| Colour | Matt black |
| Packing | Segmented for 20GP container |
| Certification | CE (2006/42/EC + EN 1493) |
| Order → Shipment | Feb 5, 2026 → Mar 6, 2026 |
Solution
To solve “shallow pit + ultra‑high travel + multi‑floor interlock”, we provided a triple‑speed hydraulics + shallow pit + fully interlocked safety package:
- Triple‑speed chain multiplier reduces cylinder stroke to 4.7m, fitting perfectly into the 500mm pit – eliminates deep excavation.
- Three high‑speed roller doors are electrically interlocked with the lift – door open = power cut; all doors closed = lift can run.
- Full‑height guardrails + mechanical fall arrest device protect personnel, loads and equipment.
Design‑to‑shipment took only 20 days, with zero production downtime.