РЕСУРСНЫЙ ЦЕНТР > КОНКРЕТНЫЕ ПРИМЕРЫ
3-тонный подъемник с направляющими для Испании| установка без ямы+ погрузка с помощью вилочного погрузчика
POSTED: 4/29/2026
Обзор
Тип проекта: Guide rail hydraulic lift platform
Клиент: FLUITECNIK, S.A. (Spain)
Промышленность: Industrial automation & hydraulics (leading European company)
Основные проблемы: Pit‑less installation, electric forklift ramp loading, CE certification for export, compact packaging for shipment
FLUITECNIK, S.A. was founded in 1990, headquartered in Pamplona, Spain. It is an experienced player in European industrial automation, covering hydraulic systems, industrial automation, wind power cooling, etc. The company has a manufacturing base in China and extensive experience sourcing from China. This guide rail lift is used for loading/unloading between the first and second floors of their warehouse – the floor slab has already been opened.
The European intralogistics automation market is growing rapidly (projected CAGR >10% from 2026‑2034). This project not only solves the client’s own material handling needs, but also serves as an opportunity to build a deeper business relationship with a well‑integrated European partner.
Технические характеристики ядра
| Параметр | Значение |
|---|---|
| Rated load capacity | 3000 кг |
| Travel height | 3750 mm |
| Number of stops | 2 stops / 2 levels |
| Platform size (L×W) | 2000 × 1500 mm |
| Направление доступа | 2000mm through‑type |
| Структура | 2 cylinders + 4 guide rails |
| Guide rails | 125H × 4 |
| Цилиндры | Ø80‑60 × 2 |
| Блок питания | 4 kW / 380V / 50Hz |
| Цепь | LH1244 × 4 |
| Wire rope | #14 × 4 |
| Platform frame | J120×60×4mm |
| Platform deck | 4 мм стальная пластина |
| Lifting frame | J160×80×4mm × 2 |
| Carriage frame | J100×50×4mm × 2 |
| Guardrails | 1.2m high + ramp (680mm, 10°) |
| Floor doors | Roller doors × 2 (W2.1 × H2.3m) |
| Enclosure | Diamond mesh (40×40mm tube, 20×40mm mesh) |
| Управление | Wireless remote + control cabinet |
| Безопасность | Door interlock + dual fall protection |
| Corrosion protection | Powder coating |
| Цвет | Rails – dark blue / Platform & guardrails – yellow |
| Упаковка | Wooden crates, minimised dimensions |
| Standard compliance | CE (MD + LVD + EMC) |
| Дата заказа | March 27, 2026 |
| Дата отгрузки | April 20, 2026 |
Решение
2.1 Pit‑less installation
- Вызов: No pit allowed – the lift must be installed directly on the existing concrete floor.
- Решение: 2‑cylinder, 4‑rail design. Lifting frame J160×80×4mm, carriage frame J100×50×4mm rectangular tubes. The unit is anchored directly to the floor.
- Преимущество: Saves civil work costs, shortens on‑site installation time – zero‑excavation deployment.
2.2 Electric forklift ramp loading
- Вызов: An electric forklift (deadweight + load much heavier than a hand truck) must drive directly onto the platform. A height difference exists.
- Решение: Add a 680mm long, 10° ramp welded integrally with the platform, plus 1.2m high guardrails around the platform.
- Преимущество: Gentle slope ensures smooth forklift entry/exit; guardrails prevent falling. Smooth material flow within a limited space.
2.3 Roller door interlock
- Вызов: Roller doors must interlock with the lift to avoid mis‑operation and safety hazards.
- Решение: Integrated electrical interlock system – door and lift are interlocked: when the lift is running the door stays open; the door can only close after the lift has stopped and is correctly positioned at the floor.
- Преимущество: Eliminates safety risks, improves operational efficiency.
2.4 CE certification & export compliance
- Вызов: Export to the EU requires CE certification (Machinery Directive 2006/42/EC, Low Voltage Directive, EMC Directive).
- Решение: Dual fall protection (chain + wire rope), fully enclosed diamond‑mesh enclosure, emergency stop button. Full technical documentation provided (drawings, risk assessment, CE certificates for key components).
- Преимущество: Reduces the client’s certification cost and customs clearance risk, ensures smooth entry into the EU market.
2.5 Compact packaging & shipping
- Вызов: Long‑distance sea freight – the client requires the smallest possible package size to lower логистика costs.
- Решение: Ship in wooden crates, module‑based splitting of main components, optimised packing dimensions.
- Преимущество: Reduces total volume, lowers sea freight and port charges, avoids oversized‑cargo customs issues.
Если вы хотите изготовить оборудование для обработки материалов по индивидуальному заказу, пожалуйста свяжитесь с нами →.





















