리소스 센터 > 사례 연구

Underwater Lifting & Rotating Stage | 3 Independent Rings + DMX512 Control

POSTED: 4/27/2026

개요

프로젝트: Underwater lifting & rotating stage (3‑tier cake structure)
클라이언트: Suzhou Siyan Culture Development Co., Ltd.
Industry: Cultural tourism & performing arts
주요 과제: Underwater corrosion, 3 independent rings, DMX512 control, 30m hydraulic piping, tight access (1500×2000mm)

Suzhou Siyan Culture Development Co., Ltd. is producing a high‑end show integrating water, wind and lighting. Immersive cultural tourism is booming across China – sold‑out water shows in Wuhan, immersive performances in Suzhou (Panmen, Zhouzhuang, Lion Hill Grand Theatre). Demand for custom stage equipment is surging.

핵심 사양

매개변수가치
Outer ring diameterΦ7000mm
Middle ring diameterΦ4900mm
Inner ring diameterΦ2800mm
Travel per ring600 / 1000 / 1500mm
Total load capacity1500kg
Rotation speed1-5 min/rev (VFD)
Hydraulic mediumWater‑glycol fluid
Corrosion protectionGalvanising + epoxy + PVC topcoat
Control protocolDMX512
Pump station distance30m
Site access1500×2000mm
Order→shipment14 days (urgent)

솔루션

2.1 Corrosion Protection: Hot‑Dip Galvanising + Multi‑Layer Coating

접근 방식: Conventional stages have no corrosion protection. This stage operates fully submerged. Solution: hot‑dip galvanising (sacrificial anode protection) + epoxy primer + PVC topcoat.

이점: Dual protection – even if topcoat is damaged, the zinc layer continues to protect.

2.2 Eco‑Friendly Medium: Water‑Glycol Fluid

접근 방식: Hydraulic oil leaks produce oil films on water. Switched to water‑glycol fluid – transparent, no visible film. Paired with hydraulic water cylinders and water pumps.

이점: Zero water contamination, reduced maintenance, pure visual effect.

2.3 Three Independent Rings: Enhanced Choreography

접근 방식: Outer ring Φ7000mm, middle Φ4900mm, inner Φ2800mm. Each lifts separately (travel 600/1000/1500mm) and rotates independently (VFD, 1‑5 min/rev).

이점: Full creative freedom – complex motions like inner rising while outer rotating, synchronised with water, wind and lighting.

2.4 30m Remote Piping: Redundant Pre‑embedding

접근 방식: Pump station 30m from pit edge. Pipes must be embedded before stage arrives. Redundant interfaces added because fountain hole locations are not finalised.

이점: Proactive coordination avoids delays; redundancy absorbs site changes.

2.5 DMX512 Unified Control: Sync with Lighting & Fountain

접근 방식: Industry‑standard lighting protocol DMX512. Each ring has three position states (low/middle/high) and three rotation states (forward/reverse/stop), with repeat positioning.

이점: Stage motion can be choreographed like lighting cues – true water‑moves‑with‑music, stage‑rotates‑with‑light immersion.

2.6 Tight Access: Segmented On‑Site Assembly

접근 방식: Entrance only 1500×2000mm – a fully assembled Φ7000mm ring cannot enter. Solution: fabricate each ring in radial segments (each ≤1500mm wide), transport separately, weld in the pit.

이점: “Divide and conquer” – fits through narrow access, reduces on‑site lifting difficulty, modular interfaces maintain factory‑calibrated performance.

자재 취급 장비를 사용자 지정하려면 다음과 같이 하세요. 문의하기 →.