Visión general

Tipo de proyecto: Guide rail hydraulic lift platform
Cliente: FLUITECNIK, S.A. (Spain)
Industria: Industrial automation & hydraulics (leading European company)
Principales retos: Pit‑less installation, electric forklift ramp loading, CE certification for export, compact packaging for shipment

FLUITECNIK, S.A. was founded in 1990, headquartered in Pamplona, Spain. It is an experienced player in European industrial automation, covering hydraulic systems, industrial automation, wind power cooling, etc. The company has a manufacturing base in China and extensive experience sourcing from China. This guide rail lift is used for loading/unloading between the first and second floors of their warehouse – the floor slab has already been opened.

Lugar de instalación – foto en vivo

El mercado europeo de la automatización intralogística está creciendo rápidamente (se prevé una tasa compuesta de crecimiento anual superior al 10 % entre 2026 y 2034). Este proyecto no solo resuelve las necesidades de manejo de materiales del cliente, sino que también supone una oportunidad para establecer una relación comercial más sólida con un socio europeo bien integrado.

Especificaciones básicas

ParámetroValor
Capacidad de carga nominal3000 kg
Altura de recorrido3750 mm
Número de paradas2 paradas / 2 niveles
Dimensiones de la plataforma (L × An)2000 × 1500 mm
Cómo llegar2000mm through‑type
Estructura2 cilindros + 4 rieles guía
Rieles guía125 H × 4
CilindrosØ80‑60 × 2
Unidad de potencia4 kW / 380V / 50Hz
CadenaLH1244 × 4
Wire rope#14 × 4
Bastidor de la plataformaJ120×60×4mm
PlataformaChapa de acero de 4 mm
Estructura de elevaciónJ160×80×4mm × 2
Carriage frameJ100×50×4mm × 2
Guardrails1.2m high + ramp (680mm, 10°)
Puertas de pisoRoller doors × 2 (W2.1 × H2.3m)
AnexoDiamond mesh (40×40mm tube, 20×40mm mesh)
ControlarWireless remote + control cabinet
SeguridadDoor interlock + dual fall protection
Protección contra la corrosiónPowder coating
ColorRails – dark blue / Platform & guardrails – yellow
EmbalajeWooden crates, minimised dimensions
Standard complianceCE (MD + LVD + EMC)
Fecha del pedidoMarch 27, 2026
Fecha de envíoApril 20, 2026

Solución

2.1 Pit‑less installation

  • Desafío: No pit allowed – the lift must be installed directly on the existing concrete floor.
  • Solución: 2‑cylinder, 4‑rail design. Lifting frame J160×80×4mm, carriage frame J100×50×4mm rectangular tubes. The unit is anchored directly to the floor.
  • Ventaja: Saves civil work costs, shortens on‑site installation time – zero‑excavation deployment.

2.2 Electric forklift ramp loading

  • Desafío: An electric forklift (deadweight + load much heavier than a hand truck) must drive directly onto the platform. A height difference exists.
  • Solución: Add a 680mm long, 10° ramp welded integrally with the platform, plus 1.2m high guardrails around the platform.
  • Ventaja: Gentle slope ensures smooth forklift entry/exit; guardrails prevent falling. Smooth material flow within a limited space.
Pit‑less installation & Application Scenario Diagram

2.3 Roller door interlock

  • Desafío: Roller doors must interlock with the lift to avoid mis‑operation and safety hazards.
  • Solución: Integrated electrical interlock system – door and lift are interlocked: when the lift is running the door stays open; the door can only close after the lift has stopped and is correctly positioned at the floor.
  • Ventaja: Eliminates safety risks, improves operational efficiency.

2.4 CE certification & export compliance

  • Desafío: Export to the EU requires CE certification (Machinery Directive 2006/42/EC, Low Voltage Directive, EMC Directive).
  • Solución: Dual fall protection (chain + wire rope), fully enclosed diamond‑mesh enclosure, emergency stop button. Full technical documentation provided (drawings, risk assessment, CE certificates for key components).
  • Ventaja: Reduces the client’s certification cost and customs clearance risk, ensures smooth entry into the EU market.
CE certification for Lifting Platform

2.5 Compact packaging & shipping

  • Desafío: Long‑distance sea freight – the client requires the smallest possible package size to lower logística costs.
  • Solución: Ship in wooden crates, module‑based splitting of main components, optimised packing dimensions.
  • Ventaja: Reduces total volume, lowers sea freight and port charges, avoids oversized‑cargo customs issues.